Classic water fall model
In a
typical model, a project begins with feasibility analysis. On successfully
demonstrating the feasibility of a project, the requirements analysis and
project planning begins. The design
starts after the requirements analysis is complete, and coding begins after the
design is complete. Once the programming
is completed, the code is integrated and testing is done. On successful
completion of testing, the system is installed.
After this, the regular operation and maintenance of the system takes
place.