Friday, July 13, 2012

Classic water fall model

Classic water fall model

In a typical model, a project begins with feasibility analysis. On successfully demonstrating the feasibility of a project, the requirements analysis and project planning begins.  The design starts after the requirements analysis is complete, and coding begins after the design is complete.  Once the programming is completed, the code is integrated and testing is done. On successful completion of testing, the system is installed.  After this, the regular operation and maintenance of the system takes place.


Software blogs

No comments:

Post a Comment